Settlement Test

Because ERKA piles are generally instantly subjected to the working load, the settlement test is sufficient for verifying the outer load-bearing capacity. In this case the pile is subjected to a timed constant load by a press jack.

Simultaneously, the ground settlement behaviour is time-dependant protocolled. Conclusions as to the visco-elastic material behaviour can be drawn from the results which can then be taken into account when manufacturing the piles.

Ground behaviour – Settlement

A settlement test is also called for where the ground behaviour is not predeterminable, i.e. the time-dependant settlement behaviour is decisive. Several settlement tests are carried out depending on the number of piles and the size of the building project.

Do you want to know more about our settlement tests?

Please contact us via e-mail or phone: